New Sleeper Bridge

Under the guidance of Chris from the A.O.N.B. Team, the CVCP volunteers have installed a new sleeper bridge. This should help users cross the gap that had widened after the wet spring weather. It can be accessed via the Hen Parc Bridge which is located on the river path south of the Railway Inn. Below is a link for a walk to Hen Parc Lane or Blackhills Lane using this sleeper bridge.

https://clynevalleycommunityproject.uk/wp-content/uploads/Walk-2-A-Short-walk-using-Hen-Parc-Bridge-in-Clyne-Valley.pdf

A huge thank you to everyone who has helped with this: Chris, Sue, Barbara, Rob, Douglas, Neil, John and Nigel – great job!

Category:
Volunteering

Related articles

Bluebell walk
30th April, 2024

The bluebells were stunning on our walk yesterday as CVCP&...

The Middle Path - Before and After
29th April, 2024

This path has been a problem for many years. It has been d...

Killay Brickworks - Phase 2
16th April, 2024

Due to the sunshine and showers, a large part of the morni...